Sometimes i would work on the roof in the dark under lights making the masonry roof. I struggled with the timbrel roof (another blog post).
I rounded the peel before work.
The roof is arches from each cornor done by formwork, then 5cm facing bricks on side, then 3 flat layers on top of that. Then 3-4 cm of clay-lime-sand plaster, then 6 coats of lime wash.
Nice roof, but it took 3 times! Not the bottles in the dome just visible. That was the insulation
5cm thick wood door. can't put it on when it is roaring as it burns.